Skip navigation
Industry
Education
Location
Manchester
Timescale
6 Weeks.
Services Provided
Commercial Projects

Room Conversion- Girls/Boys Toilets.

We are pleased to showcase the successful completion of a project converting two existing rooms into new boys and girls toilet blocks. This project focused on creating a clean, safe, and modern environment for students. The new design not only meets the highest standards of functionality and safety but also provides a welcoming and comfortable space. Our team worked diligently to ensure minimal disruption to the school’s operations, and we are proud to have delivered a project that has significantly enhanced the school’s facilities, providing modern, hygienic, and functional spaces for students.

 

Project Outcome

The project was completed successfully, transforming the two rooms into a fully functional and modern boys and girls toilet block. The new facilities meet all necessary standards and provide a clean, efficient, and user-friendly environment for students.

 

 

 

 

Service Overview.

Our company specialises in delivering comprehensive construction and renovation services tailored to meet the unique needs of our clients. We pride ourselves on our attention to detail, quality craftsmanship, and commitment to customer satisfaction.

Project Particulars

Conversion of Two Rooms into Boys and Girls Toilet Blocks.

  • We worked in partnership with our clients, contractors and
    building inspectors.
  • We ensured that we provide appropriate and cost-effective systems tailored to each area required in the project.
  • We installed cost-effective and hygienic materials which are essential for creating safe and sustainable environments. By selecting materials that are both affordable and easy to maintain, we can ensure that projects stay within budget without compromising on quality. Hygienic materials, such as solid surface countertops and vinyl flooring, are resistant to bacteria and easy to clean, promoting a healthier space for users. These materials not only meet stringent health and safety standards but also offer long-term durability, reducing the need for frequent replacements and repairs. This approach not only saves costs in the long run but also contributes to a cleaner, safer environment for everyone.
Challenges faced.

During the conversion of the two rooms into boys and girls toilet blocks, we encountered several challenges:

  1. Structural Modifications:

    • Altering the existing brickwork to create new openings required precise planning and execution to ensure structural integrity and compliance with building regulations.
  2. Space Constraints:

    • Working within the limited space of the existing rooms necessitated careful design and layout planning to maximize functionality and accessibility.
  3. Coordination of Trades:

    • Coordinating multiple trades, including electricians, plumbers, and carpenters, to work seamlessly together was crucial to maintaining the project timeline and quality standards.
  4. Material Selection:

    • Choosing cost-effective yet hygienic materials that met both budget constraints and health standards required thorough research and supplier negotiations.
  5. System Integration:

    • Integrating new systems such as lighting, ventilation, and vape detectors with the existing infrastructure posed technical challenges that required innovative solutions.
  6. Compliance and Testing:

    • Ensuring all installations met safety and regulatory standards involved rigorous testing and certification processes, adding complexity to the project.

 

Despite these challenges, our team’s expertise and collaborative approach enabled us to successfully complete the project, delivering a high-quality, functional, and modern set of toilet blocks.