Skip navigation
Industry
Leisure
Location
Manchester
Timescale
February 2024-Present.
Services Provided
Fire Stopping Solutions

Fire Stopping Project for AJ Bell Stadium.

Introduction.

Fusion services are delighted to have been awarded the fire stopping project at the AJ Bell Stadium, located in Salford, Greater Manchester. AJ Bell serves as the home ground for both the Salford Red Devils Rugby League Football Club and the Sale Sharks Rugby Union Football Club. As part of its safety measures, a comprehensive fire stopping project was undertaken to enhance fire resistance and protect occupants, infrastructure, and assets.


Scope.


The fire stopping project covered the entire stadium, including:
1. Structural Penetrations: Identifying and sealing openings in walls, floors, and ceilings to prevent fire and smoke spread.
2. Cable and Pipe Penetrations: Sealing cable trays, conduits, and pipe penetrations to maintain fire compartmentation.


Methodology.


1. Survey and Assessment:
o Conducted a survey to identify existing fire stopping deficiencies.
o Assessed the condition of fire-rated walls, floors, and ceilings.
2. Sealing and Remediation:
o Used fire-resistant materials (intumescent sealants, fire collars, etc.) to seal penetrations.
3. Testing and Certification:
o Conducted post-installation tests to verify the effectiveness of fire stopping measures.
o Issued certificates for compliant areas.


Challenges.


• Access: Coordinating work across different areas of the stadium without disrupting daily operations.


Conclusion.


The fire stopping project at AJ Bell Stadium significantly enhances fire safety, ensuring compliance with regulations and safeguarding all stakeholders.
________________________________________

Service Overview

 

Service Overview

Committed to ensuring full building compliance, all of our fire door works and penetration seals are certified through third party accreditation under the IFC or BM TRADA Q-Mark Fire Door Installation/Maintenance scheme.




Project Particulars

 

  • We worked in partnership with our clients, architects, contractors and
    building inspectors
  • We ensured that we provide appropriate and cost-effective fire stopping systems tailored to each area required in the building.
  • We install both adjustable and fixed penetration seals through
    walls for the passage of services such as drainage, pipes and cables.
Challenges Faced

Challenges Faced

Committed to ensuring full building compliance, all of our fire door works are certified through third party accreditation under IFC or BM TRADA Q-Mark Fire Door Installation/Maintenance scheme.